Luna1 Market Pulse

AFTER HOURSOpens Thursday in 14h 30m
i

Market data may be delayed and is provided for informational and educational purposes. Luna1 does not guarantee its accuracy or completeness.

SPYS&P 500 ETF—Change unavailableUNAVAILABLE
RUTRussell 2000—Change unavailableUNAVAILABLE
US10YU.S. 10-Year Treasury—Change unavailableUNAVAILABLE
GOLDGold—Change unavailableUNAVAILABLE
NVDANVIDIA—Change unavailableUNAVAILABLE
AAPLLong-Term Compounders—Change unavailableUNAVAILABLE
COSTLong-Term Compounders—Change unavailableUNAVAILABLE
AMZNLong-Term Compounders—Change unavailableUNAVAILABLE
Data via Financial Modeling Prep
← Professional Profile / Featured project
Luna1 ResearchFlagship portfolio model · Infrastructure finance

10-Year Data Center Investment & Development Model

Hypothetical 20 MW development · Two independent 10 MW phases

Starting capacity
20 MW
Illustrative CapEx
$240M
Development phases
2
Investment horizon
10 years

For modeling practice only. The $12 million per MW assumption is illustrative and is not an estimate of any specific LightEdge, customer, facility, or real-world project.

This hypothetical case study was developed for educational and portfolio purposes. All financial assumptions are illustrative or derived from appropriately cited public sources. It does not use confidential employer, customer, facility, pricing, capacity, or internal financial information.

Project thesis

This case study evaluates the economics of developing a hypothetical 20 MW data center over two 10 MW phases. The model examines how construction timing, lease-up, operating performance, and terminal valuation interact to drive project returns over a 10-year investment horizon.

Model framework implemented · Financial inputs await entry · Power BI report in development

01 / Key assumptions

Central assumption register · USD · 10-year investment horizon

Only capacity, horizon and illustrative CapEx are supplied. Enter operating, valuation and timing assumptions; use zero explicitly for excluded costs. Edits stay in this browser session. Download your assumptions before leaving.

Total capacity · calculated
20 MW
Development budget · calculated
$240,000,000
Phases
2
Horizon
Year 0 + 10 years

CapEx category allocation · user-editable

Categories allocate the development budget; they do not add a second contingency. The initial budget is entirely unallocated under Other. Category shares must total 100%.

Edit CapEx categories · 100.0% allocated

Operating costs · USER INPUT

Power is calculated separately. Fixed amounts are annual full-project budgets, allocated by phase MW and incurred only when that phase is available. Variable amounts use utilized MW; revenue shares use each phase’s revenue. Costs do not escalate unless their driver changes.

Edit operating expense categories
Awaiting valid inputs · outputs withheld
Review 20 input checks
  • Discount rate: enter a value from 0 to 1.
  • Exit EBITDA multiple: enter a value from 0 to 100.
  • Selling cost: enter a value from 0 to 1.
  • Revenue rate: enter a value from 0 to 1000000000.
  • Revenue escalation: enter a value from -0.5 to 1.
  • Other annual revenue per leased MW: enter a value from 0 to 1000000000.
  • PUE: enter a value from 1 to 3.
  • Power price: enter a value from 0 to 100.
  • Effective cash tax rate: enter a value from 0 to 1.
  • Working capital share: enter a value from 0 to 1.
  • Maintenance CapEx per available MW: enter a value from 0 to 1000000000.
  • Phase 1: enter an availability year from 1 to exit year.
  • Phase 1: complete all CapEx percentages (0–100%).
  • Phase 1: complete all Lease percentages (0–100%).
  • Phase 1: complete all Utilization percentages (0–100%).
  • Phase 2: enter an availability year from 1 to exit year.
  • Phase 2: complete all CapEx percentages (0–100%).
  • Phase 2: complete all Lease percentages (0–100%).
  • Phase 2: complete all Utilization percentages (0–100%).
  • Complete each named operating cost; percentage costs must be 0–100%. Enter zero explicitly to exclude a cost.

02 / Development timeline

Each phase has its own expenditure schedule and availability year. Availability begins at the start of that year; all development spending must finish in earlier years. Year 0 is the initial investment date and Years 1–10 are annual end-period cash flows. No equal phasing is imposed.

Phase 1 · $120,000,000 calculated budget

Allocation: 0.0% of phase CapEx. Lease percentages are contracted shares of phase capacity; utilization is the used share of leased capacity.

Edit Phase 1 Year 0–10 schedule
USER INPUT · Percentages, not market estimates
YearCapEx allocationLeased capacityUtilization of leased capacity
0 / Development
1
2
3
4
5
6
7
8
9
10

Phase 2 · $120,000,000 calculated budget

Allocation: 0.0% of phase CapEx. Lease percentages are contracted shares of phase capacity; utilization is the used share of leased capacity.

Edit Phase 2 Year 0–10 schedule
USER INPUT · Percentages, not market estimates
YearCapEx allocationLeased capacityUtilization of leased capacity
0 / Development
1
2
3
4
5
6
7
8
9
10

Enter the missing assumptions to calculate this schedule. No market pricing or unentered financial results are supplied.

03 / Capacity & lease-up

Pre-leasing records contracted capacity only. Revenue and power usage start when the phase is available. Leased MW can exceed available MW during pre-leasing; unleased operating capacity excludes those pre-leases. After exit, the model stops operating the asset.

Enter the missing assumptions to calculate this schedule. No market pricing or unentered financial results are supplied.

¹ Contracted MW / total phase capacity. ² Utilized MW / available MW. Editable utilization above is utilized / leased MW.

04–06 / Revenue, operating expenses & EBITDA

IT energy = utilized MW × 1,000 × 8,760. Facility energy = IT energy × PUE; power cost = facility energy × price / kWh. PUE already includes cooling electricity. The separate cooling-service line must exclude electricity to avoid double counting. Full-year operations begin in the availability year.

Enter the missing assumptions to calculate this schedule. No market pricing or unentered financial results are supplied.

07 / Unlevered free cash flow

EBITDA − effective cash taxes − development CapEx − maintenance CapEx − change in working capital. Cash taxes use an explicitly entered effective rate on positive EBITDA by phase; this simplified proxy does not model tax depreciation or loss carryforwards. No debt, interest, debt draws or repayment is included.

Enter the missing assumptions to calculate this schedule. No market pricing or unentered financial results are supplied.

08–09 / Exit valuation & investment returns

Exit value uses consolidated exit-year EBITDA × the user’s exit multiple, less selling costs. A positive multiple requires positive terminal EBITDA. Working capital is released separately at exit. No disposal tax is modeled; selling-cost assumptions are not tax estimates. Earlier exit stops all subsequent operations and cannot precede either phase’s availability.

Enter the missing assumptions to calculate this schedule. No market pricing or unentered financial results are supplied.

Returns methodology

NPV discounts annual cash flows to Year 0 using the entered project discount rate. IRR is reported only for conventional outflows followed by inflows; multiple sign reversals or a missing sign change produce N/A. MOIC = sum of positive net investor cash flows / absolute sum of negative net investor cash flows. Thus invested capital includes net operating deficits and may differ from gross development spend. Payback is fractional-year recovery of cumulative unlevered FCF that remains nonnegative through exit, excluding exit proceeds and released working capital. Capacity pricing escalates from Year 1, including during a later phase’s construction. All values are nominal USD.

10 / Scenario analysis

Scenario overlays are USER INPUT. All begin neutral (1.00x and no timing shift), so upside and downside are identical until you edit them. A lease-ramp factor changes each annual contracted share, capped at 100%; it does not alter the first availability year. Construction delays shift both expenditure and operating ramps. Invalid scenarios are withheld.

Edit Upside case
Edit Downside case

Enter the missing assumptions to calculate this schedule. No market pricing or unentered financial results are supplied.

11 / Investment sensitivities

Three two-variable matrices. Rows and columns apply 0.90x / 1.00x / 1.10x stress factors to your base inputs; these are analytical perturbations, not market assumptions. Lease-up speed means scaling the independent annual contracted ramps, capped at 100%, without bringing capacity online earlier.

Enter the missing assumptions to calculate this schedule. No market pricing or unentered financial results are supplied.

12 / Interactive model dashboard

Power BI dashboard · In Development

Infrastructure investment committee report

Six-page report specification. No live dashboard is connected. The website engine supplies the financial results; Power BI will visualize the exported tables.

  1. Executive overview

    Capacity, illustrative CapEx, horizon, NPV, IRR and MOIC. Revenue / EBITDA trend, annual unlevered FCF, capacity utilization and CapEx by phase. Single-select scenario.

  2. Development

    Stacked annual CapEx by phase, category breakdown, construction / available timeline, and cumulative investment.

  3. Capacity & lease-up

    Available versus leased MW, utilization trend, independent phase ramps, and the capacity-to-unleased bridge.

  4. Operating performance

    Revenue, EBITDA, margin and power KPIs; revenue / EBITDA combo chart, expense breakdown, facility energy, PUE and power cost per utilized MW.

  5. Investment returns

    NPV, IRR, MOIC, payback and exit value; annual and cumulative cash flow, plus a cash-realization bridge.

  6. Scenario & sensitivity

    Base / upside / downside comparisons, construction-cost / lease-ramp IRR heatmap and construction-cost / exit-multiple NPV heatmap. Highlight power and terminal-value risk.

13 / Investment conclusion

No investment conclusion is available until the assumption register and phase schedules are complete. Priority diligence questions are construction cost and timing, lease-up, power economics and exit valuation.

This hypothetical case study was developed for educational and portfolio purposes. All financial assumptions are illustrative or derived from appropriately cited public sources. It does not use confidential employer, customer, facility, pricing, capacity, or internal financial information.

What this demonstrates

  • Infrastructure Finance
  • Data Center Economics
  • Financial Modeling
  • Capital Budgeting
  • Development Modeling
  • Lease-Up Analysis
  • Revenue Forecasting
  • Operating Forecasting
  • NPV
  • IRR
  • MOIC
  • Exit Valuation
  • Sensitivity Analysis
  • Power BI data preparation

Power BI report publication and the Excel attachment remain pending. The calculation engine and structured export layer are implemented.

This project combines financial modeling with prior exposure to mission-critical data center operations to evaluate infrastructure through both an operating and capital-allocation lens.

Download / evidence

The JSON package includes the model assumptions, disclosures, dimensions, facts and scenario validity register. CSV files contain the selected table; use them together with the assumptions and specification. Invalid scenarios are identified and omitted from calculated facts.

Excel Financial Model

Not yet attached · A reviewed public artifact can be attached here when available.

Power BI Dashboard

Not yet attached · A reviewed public artifact can be attached here when available.

PDF Investment Case

Not yet attached · A reviewed public artifact can be attached here when available.

Power BI PDF Export

Not yet attached · A reviewed public artifact can be attached here when available.

For modeling practice only. The $12 million per MW assumption is illustrative and is not an estimate of any specific LightEdge, customer, facility, or real-world project.